ChecklistSchools7 min read
Robotics lab planning checklist
Space, power, storage, safety and the practical decisions that are expensive to change once a robotics lab is installed.
Updated February 24, 2026 · For schools, boards, facilities
Most of what makes a robotics lab work or not is decided before any hardware arrives. This is the list we work through with schools, in the order the decisions actually bind.
Space and layout
- Bench height suitable for the age group. A bench sized for adults slows younger builders noticeably.
- Floor area for driving and testing that is not the same area as the benches.
- A test surface that matches what you will compete or demonstrate on.
- Clear sightlines from the instructor position to every bench.
- Room to walk behind seated learners carrying a robot.
Power
- Outlets at bench level, not only along the walls. Trailing extension leads under a robotics bench are a hazard.
- Enough circuits that simultaneous charging does not trip anything.
- A defined charging station with supervision, not batteries charging on benches overnight.
- Somewhere safe to store batteries that is not the same drawer as loose metal parts.
Storage: the one most often underestimated
- One labelled bin per team, deep enough to hold a partly-built robot assembled.
- Shelving depth checked against your largest chassis, not your smallest.
- Separate small-parts storage. Mixed fasteners cost more session time than any other single thing.
- A spares drawer with a named owner who restocks it.
Network and software
- Whether the devices learners program on can reach what they need through the school's filtering.
- Driver and firmware installation rights. A locked-down image that cannot see a microcontroller stops a session dead.
- Somewhere learner work is saved that survives a device being reimaged.
Safety
- Eye protection stored at the point of use, not in a cupboard.
- A written rule for who may use cutting and soldering equipment, and when.
- First aid provision that accounts for burns and cuts, not just general injury.
- Ventilation wherever soldering or 3D printing happens.
Recurring, not one-time
- A consumables budget line: motors, connectors, wheels, filament, fasteners.
- Time for someone to maintain kits between terms.
- A second trained staff member, so the program survives a staffing change.